Kardemir Iron Steel Industry Facility

Route Name Pipe Diameter Route Length (mt.) Diverter Automation Carrier's Travel Time
Ladle Furnace 2 to Laboratory 80/75 mm. 700 mt. - SCADA System Monitoring and Control 60 secs.
New Foundry 1 to Laboratory 80/75 mm. 110 mt. 1 SCADA System Monitoring and Control 15 secs
Blast Furnace 5 to Laboratory 80/75 mm. 1520 mt. - SCADA System Monitoring and Control 120-150 secs.
Vacuum Degassing to Laboratory 80/75 mm. 400 mt. - Integration to Installed Scada System 40 secs.
Torpedo Pit No 1-2 to Laboratory 80/75 mm. 400 mt. 1 Integration to Installed Scada System 45 secs.
Continuous Casting 4 to Laboratory 80/75 mm. 500 mt. - Integration to Installed Scada System 60 secs.
Converter 1-2 to Laboratory 80/75 mm. 450 mt. 1 SCADA System Monitoring and Control 50 secs.
Ladle Furnace No 4 to Laboratory 80/75 mm. 250 mt. 1 SCADA System Monitoring and Control 85 secs.

    Benefits

  • Time Saver
  • Productive
  • No Loss of labor
  • Traceability

Project info

  • Client

    Kardemir Iron Steel Industry Plant

  • Category

    Pneumatic Sample Transfer

  • Location

    Karabük / TURKEY